Schedule 40 and Schedule 80 pipe of the same NPS share one outside diameter; Sch 80 has a thicker wall and smaller bore. At NPS 2 the wall grows from 0.154 in to 0.218 in (+42%), the ID falls from 2.067 in to 1.939 in, and plain-end weight rises from 3.66 to 5.03 lb/ft (+37%).

NPS 2 wall
0.154 in vs 0.218 in
NPS 2 ID
2.067 in vs 1.939 in
NPS 2 weight
3.66 vs 5.03 lb/ft
Standard
ASME B36.10M, carbon steel 7,850 kg/m³

Pipe schedule & weight calculator

Outside diameter

2.375 in

60.3 mm

Wall

0.218 in

5.54 mm

Inside diameter

1.939 in

49.3 mm

Per foot

5.027 lb

7.482 kg/m

Total, 20 ft

100.5 lb

45.61 kg

Schedule

Sch 80

NPS 2

Pipe
NPS 2, Sch 80
Material and density
Carbon Steel, 7,850 kg/m³ (0.2836 lb/in³)
Outside diameter (OD)
2.375 in · 60.3 mm
Wall thickness
0.218 in · 5.54 mm
Inside diameter (ID)
1.939 in · 49.3 mm
Plain-end weight
5.027 lb/ft · 7.482 kg/m
Total for 20 ft
100.5 lb · 45.61 kg
  • At NPS 2, Sch 80 and XS are the same wall (0.218 in).
  • Plain-end weight, without coupling or threads. ASTM A53 allows ±10% on delivered weight.

Worked calculation

  1. Same outside diameter. NPS 2 has OD 2.375 in (60.3 mm) in every schedule. Only the wall changes.
  2. Wall thickness. Sch 40 = 0.154 in; Sch 80 = 0.218 in. 0.218 ÷ 0.154 ≈ 1.416, so 42% thicker.
  3. Inside diameter. ID = OD − 2 × wall. Sch 40: 2.375 − 2 × 0.154 = 2.067 in. Sch 80: 2.375 − 2 × 0.218 = 1.939 in.
  4. Flow area. Area scales with ID². (1.939 ÷ 2.067)² ≈ 0.880, about 12% less cross-section.
  5. Plain-end weight. ASME B36.10M walls, carbon steel at 7,850 kg/m³ (0.2836 lb/in³): 10.69 × (OD − wall) × wall: Sch 40 ≈ 3.66 lb/ft (5.44 kg/m); Sch 80 ≈ 5.03 lb/ft (7.48 kg/m), 37% heavier.

Reference tables

Sch 40 vs Sch 80: wall and inside diameter (inches)
NPSODSch 40 wallSch 80 wallWall increaseSch 40 IDSch 80 ID
1/8 0.4050.0680.095+40%0.2690.215
1/4 0.5400.0880.119+35%0.3640.302
3/8 0.6750.0910.126+38%0.4930.423
1/2 0.8400.1090.147+35%0.6220.546
3/4 1.0500.1130.154+36%0.8240.742
1 1.3150.1330.179+35%1.0490.957
1 1/4 1.6600.1400.191+36%1.3801.278
1 1/2 1.9000.1450.200+38%1.6101.500
2 2.3750.1540.218+42%2.0671.939
2 1/2 2.8750.2030.276+36%2.4692.323
3 3.5000.2160.300+39%3.0682.900
3 1/2 4.0000.2260.318+41%3.5483.364
4 4.5000.2370.337+42%4.0263.826
5 5.5630.2580.375+45%5.0474.813
6 6.6250.2800.432+54%6.0655.761
8 8.6250.3220.500+55%7.9817.625
10 10.7500.3650.594+63%10.0209.562
12 12.7500.4060.688+69%11.93811.374
Sch 40 vs Sch 80: plain-end weight
NPSSch 40 lb/ftSch 80 lb/ftIncreaseSch 40 kg/mSch 80 kg/m
1/8 0.250.31+29%0.360.47
1/4 0.430.54+26%0.630.80
3/8 0.570.74+30%0.851.10
1/2 0.851.09+28%1.271.62
3/4 1.131.48+30%1.682.20
1 1.682.17+29%2.503.24
1 1/4 2.283.00+32%3.394.46
1 1/2 2.723.64+34%4.055.41
2 3.665.03+37%5.447.48
2 1/2 5.807.67+32%8.6311.41
3 7.5810.26+35%11.2915.27
3 1/2 9.1212.52+37%13.5718.63
4 10.8015.00+39%16.0722.32
5 14.6320.80+42%21.7830.95
6 18.9928.60+51%28.2742.57
8 28.5843.43+52%42.5464.64
10 40.5364.50+59%60.3195.98
12 53.5888.72+66%79.74132.04

Theoretical carbon steel weights. Published tables differ by about 0.1–0.3% from rounding.

Where the schedule names coincide
NPSSTD (in)Sch 40 (in)XS (in)Sch 80 (in)Same?
6 0.2800.2800.4320.432STD = Sch 40, XS = Sch 80
8 0.3220.3220.5000.500STD = Sch 40, XS = Sch 80
10 0.3650.3650.5000.594STD = Sch 40, XS ≠ Sch 80
12 0.3750.4060.5000.688STD ≠ Sch 40, XS ≠ Sch 80

STD equals Sch 40 through NPS 10; XS equals Sch 80 through NPS 8.

Engineering and fabrication notes

Schedule 40 and Schedule 80 pipe of the same nominal size have the same outside diameter, so both fit the same hangers, clamps and many fittings. Only the wall changes. At NPS 2 the Sch 80 wall is 42% thicker, the inside diameter shrinks from 2.067 in to 1.939 in (about 12% less flow area) and the pipe weighs 37% more per foot. A heavier schedule is not automatically a higher pressure rating: that depends on material grade, temperature, joint type and the governing code, so use the code and your engineer to size pressure piping. This page gives dimensions and theoretical weight only.

Frequently asked questions

Do Schedule 40 and Schedule 80 pipe have the same outside diameter?

Yes. For each Nominal Pipe Size the OD is fixed (NPS 2 is 2.375 in) and the schedule only sets the wall thickness, so the inside diameter shrinks as the schedule gets heavier.

How much heavier is Schedule 80 than Schedule 40?

It depends on size. At NPS 2, Sch 80 is 5.03 lb/ft against 3.66 lb/ft for Sch 40, 37% more. The relative increase grows with pipe size: at NPS 12 the plain-end weight rises by 66%.

Is XS the same as Schedule 80?

Through NPS 8, yes. At NPS 10 and 12, XS is 0.500 in, which is thinner than Sch 80 (0.594 in and 0.688 in). Likewise STD equals Sch 40 through NPS 10 but not at NPS 12.